Our projects

Our solutions work in over 20 countries: on public and non-public railways in Russia, CIS countries, Indonesia, Columbia, Brazil and other countries

The map traces the implemented systems. Select the particular objects on the map click on the name of the system. To view a system that is not displayed on the map click on its name.

System selection

    Our portfolio

    • Taman Transshipment Complex

      The railway infrastructure of Taman Transshipment Complex combines the axle counting products ESSO, ESSO-M and ESSO-M-2, MPC-I Interlocking and ABTC-I Automatic Block System.

      Our solutions ensure safe train traffic at 4 parks and in the bottleneck of a yard park at Panagia station. DKT Wheel Sensors control track sections of the hump yard.

      Several stations have MKM Transportable Containers combined into complexes. 

    • Indonesia

      ESSO-M Axle counting system is implemented on all railway types of Indonesia. The system controls rail track occupancy on a coal loading station on Sumatra Island and Jakarta-Gudang port station. 37 counting posts are also installed on two stations and a line between them of a mainline coming through one of the towns of South Sumatra province.
      Moreover, ESSO-M system, featuring 107 DKU wheel sensors is installed on an urban line in the capital of Indonesia – Jakarta.
      Water level rises above the rail heads during rainy season in Indonesia and remains at that level for over a week. ESSO-M is resistant to various climatic conditions and provides uninterrupted operation of railway lines during floods and after water recedes.
       

    • Sverdlovsk railway - branch of RZD

      KTS AZS Automatic Rolling Stock Chocking System operates at Sverdlovsk railway. The solution is designed for automation of precise stopping and train chocking on reception and departure tracks of railway stations. Chocking a train with the total mass of up to 10 000 tonnes with the track slop up to 0.0003 and up to 5 000 tonnes with the track slop up to 0.0006. No track operating staff and brake chockes.

    • EVRAZ Group

      EVRAZ Group (ZSMK, NTMK, KGOK). There are 1351 ESSO Counting Posts, 154 switches with MPC-I Interlocking and 5 MAPS Level-Crossings. Remote control of two stations from a single interlocking tower was implemented in 2020. EVRAZ railway infrastructure is equipped with DK-I Dispatcher Control System and Car Positioning System.
      The non-relay MPC-I with ESSO-M-2 Axle Counting System were implemented in 2018. The equipment is placed into MKM Transportable Container.
      Three stations are equipped with MPC-I in a hot redundancy configuration. For the first time there has been applied UKC-U Interlocking Controller which combines functions of two UKCs introduced in one cabinet.
       

    • Gabon, Central Africa

      eDKT Wheel Sensors have been installed in the Gabonese Republic, Central Africa. They work as a part of the system detecting RFID-tags.

    • South-Ural railway - branch of RZD

      ARM ETs has been applied at one of the stations of South Ural railway. It is a block route-relay interlocking with computer route setting system. A conventional relay EI control panel has been replaced with the modern ARM DSP Station Work Terminal. The retrofitted EI was supplemented with the record and archive functions and remote control of a neighbor station.

    • NLMK Group

      NLMK Group (NLMK, NLMK-Kaluga, NLMK-Ural, Stoylensky GOK) have 1589 counting posts of ESSO and ESSO-M Axle Counting Systems, 93 points are controlled by MPC-I Interlocking. The hump yard at NLMK is equipped with DKT Wheel Sensors.

    • Far East railway - branch of RZD

      Participation in implementation of the strategic project at Far East railway. Construction of infrastructure at the sections Komsomolsk-on-Amur – Sovetskaya Gavan, Komsomolsk-on-Amur – Volochaevka, Baranovskiy – Makhalino. 70 stations are fitted with MPC-I Interlocking. 
      Urgal – Izvestkovaya haul is controlled by ESSO system. MAPS-M is installed at the non-guarded level-crossing with 12 counting posts in the area of level-crossing.

    • Zabaikalsk railway

      Collaboration in creation of transport infrastructure for development of natural resources in southeastern part of Transbaikalian Territory, construction of a new railway line Naryn – Lukogan – Bystrinskiy GOK. 6 stations are equipped with MPC-I Interlocking, 7 level-crossings – with MAPS system at the section Naryn 1 (Borzya) – Bystrinskiy GOK. 
      Construction of new stations at Bystrinskiy GOK: 71 ESSO Counting Posts, 31 switches are interlocked by MPC-I, 2 level-crossings are controlled by MAPS.
       

    • Brazil

      In Brazil ESSO-M Axle Counting is installed on a single track level-crossing used for transportation of natural resources and fuel.
      In 2022 the system was implemented on a level-crossing near the town of Imperatriz, located on the Tocantins River. DKU Wheel Sensors control occupancy and vacancy of the track and a point section, as well as serve as a switch protection system.
      Also ESSO-M operates at station Tutoia located in Araraquara city. DKU Wheel Sensors were installed in the south and north station necks adapted the Sensor claws for TR68 rails. The Sensors are involved in track vacancy/occupancy control and protect switches from unauthorized operation under a rolling stock.  
       

    • Nornickel

      Comprehensive modernization of railway infrastructure at PAO Nornickel: 114 points are interlocked by MPC-I, 147 counting posts operated by ESSO-M, 11 level-crossings are controlled by MAPS, 7 hauls are controlled by MPB. The project features remote point control. There are three MKM Transportable Containers, 55 km of fiber optic cable are laid down.

    • South Korea

      ESSO-M Axle Counting System has been operating in South Korea since 2019. It works at Light Rail Transport in Osong City. In 2021 the system was integrated in the subway line between Seoul and Goyang City. More than 27 000 people use this line daily.

    • Kazakhstan

      Large scopes of works have been performed at the industrial railways of Kazakhstan and JSC NC KTZ: 282 ESSO Counting Posts, 6 stations interlocked by MPC-I, 5 level-crossings controlled by MAPS, 10 hauls controlled by MPB Electronic Semiautomatic Block System.
      Main line in Kazakhstan is equipped with two automatic block posts of MPB system. This solution increases throughput of the haul and the whole line. A new product ESSO-ILS has been put into operation for the first time at Atirau Oil Refinement Factory (TOO RTI-ANPZ).
       

    • SUEK Krasnoyarsk

      SUEK Krasnoyarsk: 138 points are interlocked by MPC-I , 262 ESSO Counting Posts, MAPS at the double track section. At one of the stations there have been integrated MPC-I Interlocking with hot redundancy and cascading technologies via Ethernet. Another station with 19 points is equipped with ARM ETs soultion.

    • Apatit (PhosAgro Group)

      Extreme operating conditions of the systems at Apatit. The town is located to the north of the Arctic Circle where snow season lasts for 7-8 months. One of the stations is located in the tunnel under the mountain with daily blasting operations. MPC-I Interlocking operates 166 points, ESSO Axle Counting System controls 393 counting posts.

    • Kaliningrad Railway – Branch of JSC Russian Railways

      MPC-I Computer-based interlocking system and MAPS Level-crossing protection system are installed on the Baltiysk – Prokhladnyi Line and Prokhladnyi passing. The passing is fitted with two MKM Equipment containers: one with the station master terminal and backup control panel and the other is fitted with interlocking equipment, power supply systems and the signaling engineer terminal. The interlocking controls 3 points, 1 derailer and 11 light signals.

      Here, for the first time, integration has been performed with Anakonda Train spacing system developed by AO NIIAS, whereas signaling equipment is controlled from Shipovka Station via two ARM DSP terminals. Part of the line along Primorskaya Bay is controlled by MAPS Level-crossing protection system.

    • AO Eurochem

      An outdated electric interlocking has been replaced with a new MPC-I Computer-based interlocking system featuring redundancy on Druzhnaya Station of AO Eurochem. MPC-I controls 26 points and 40 light signals of the enterprise. The track circuits have been replaced by DKU-M wheel sensors, which are a part of ESSO-M-2 Axle counting system.

    • OOO Sukhodol Seaport

      Port Sukhodol Station is a part of the coal, which was built for reception, storing and loading of coal to vessels. MPC-I Computer-based interlocking system featuring cascaded UKC interlocking controller controls 41 point and 50 light signals on the station. The track sections are controlled by ESSO-M Axle counting system, featuring 71 counting posts. Tower equipment post has been fitted with modern terminals for the station master and the signaling engineer.

    • Bulgaria

      During reconstruction of Plovdiv Station, the BMRC block route-relay interlocking has been supplemented with ARM EC solution for modernization of relay interlocking systems, developed by Promelectronica. A modern ARM DSP station master terminal has been installed Instead of the outdated control panel. ARM EC now controls 78 points, 77 light signals and integration with 7 lines adjacent to the station. ARM DSP software was translated to Bulgarian language.

      Track clearance on the station is controlled by ESSO-M Axle counting system, featuring 126 DKU Wheel sensors as counting posts. Plovdiv is the largest foreign station fitted with axle counters, developed by Promelectronica.