Trackside signaling equipment (light signals and points) on 6T and 13T sidings, as well Station 1 are controlled and monitored by MPC-I Computer-based interlocking system. Clearance and occupancy of the train tracks are controlled by DKU-M Wheel sensors, which transmit the data directly to ShTK Communications cabinet via USKS-M Communication Integration Unit. This universal controller ensures secure transmission of data from counting posts to MPC-I and replaces the whole axle counting system cabinet.
Station 1 is fitted with ARM DNC train dispatcher terminal to control light signals and points on 6T and 13T sidings. Also, Station 1 has ARM DSP Station master terminal to control equipment on sidings from 10T through 13T, whereas ARM DSP on siding 7T has a capability to control equipment on sidings from 6T through 9T. Since there are no infrastructure or permanent buildings available, all signaling equipment is housed in mobile equipment containers.